CATEGORIES

  • UV-C purification:  Inactivation of bacteria#1-2 and viruses#3-5
  • 3 Layer filters*: Prevention of mold、Deactivation of bacteria/virus、Removal of odours
  • MHI Allergen Clear Filter inactivates SARS-CoV-2 (Covid-19 Virus) particles up to 99.998%#6 by MHI's enzyme-urea technology
  • 3D AUTO Air Flow
  • MHI Jet Air Technology
  • ALL DC Inverter Technology
  • Compact Outdoor Unit: 420mmH x 780mmW (Easy Installation)

(Staphylococcus aureus#1、Escherichia coli#2、Influenza A virus subtype H3N2#3、Enterovirus 71#4、Influenza A virus subtype H1N1#5)

*(Pre-Filter、Allergen Clear Filter、Active Carbon Filter)

#1 Guangdong Detection Center of Microbiology: No.2023FM22768R01D

#2 Guangdong Detection Center of Microbiology: No.2023FM22768R02D

#3 Guangdong Detection Center of Microbiology: No.2023FM22768R03D

#4 Guangdong Detection Center of Microbiology: No.2023FM22768R04D

#5 Guangdong Detection Center of Microbiology: No.2023FM22768R05D

#6 Test method: Anti-viral test using severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2) Laboratory: Japan Textile Products Quality and Technology Center 

ModelIndoor SRK53MHIPC1
Outdoor SRC53MHIPC1
Power SourcePh/V/Hz1 / 220 / 50
Cooling CapacityRated (Min~Max) kW5.31
BTU/h18,118
Power ConsumptionCooling/Heating kW1.84
Running CurrentCooling/Heating A8.8
COPCooling/Heating 2.89
Sound Pressure Level (Lo – Hi)Indoor (Cooling/Heating) dB(A)23 - 45
Outdoor (Cooling/Heating) dB(A)54
Air Flow (Hi - Lo)Indoor (Cooling/Heating) m3/min11.67
Outdoor (Cooling/Heating) m3/min
Dimension (H x W x D)Indoor mm294 x 798 x 230
Outdoor mm420 x 780 x 290
Net WeightIndoor kg10.0
Outdoor kg24.5
RefrigerantR32
Refrigerant Piping SizeLiquid / Gas mm(in)6.35(1/4") / 12.7(1/2")
Max. Piping Height Differencem5
Max. Piping Lengthm20
Energy Label Grade1

Remark: 
  • #Refrigerant pipe area
  • The product specifications are provided by factories of Mitsubishi Heavy Industries.
  • Designs and specifications are subject to change without prior notice.
  • Before purchase and installation, the space and position needed for installation should be confirmed by qualified engineers.